Trend: P3 for Green Infrastructure
Prince George County Maryland is on the clock to clean up Chespaeake Bay. This project will require:
- Over 10 years, it must convert 15,000 acres of watertight surfaces into surfaces that will either soak up or treat rainwater. T
- it will have to add 46,000 stormwater devices
The P3 will:
- Install rain gardens, cisterns, permeable pavements, and other devices for filtering and absorbing stormwater.
- Finance 30- 40% of the program’s costs immediately to speed along construction
Governing